About This Work

One Person Managing Every Trade

A bathroom remodel touches plumbing, electrical, framing, waterproofing, tile, and finish carpentry. When those phases are handled by five different companies that do not talk to each other, you get delays, finger-pointing, and a bathroom that is unusable for six weeks longer than promised.

Sam manages the entire remodel himself. That means the tile guy is not waiting on the plumber, the schedule is real, and there is one person accountable for the finished result. Most full bathroom remodels wrap in two to three weeks, not two months.

Waterproofing is where corners get cut most often and where failures cost the most. Every shower we build gets a proper waterproof membrane behind the tile, sloped correctly to the drain. It is the part nobody sees and the part that determines whether your bathroom lasts twenty years or two.

What's Included

  • Full demo and haul-away of old fixtures
  • Plumbing rough-in and fixture relocation
  • Proper shower waterproofing membrane
  • Floor and wall tile installation
  • Custom shower niches and accent bands
  • Vanity, countertop, and sink installation
  • Lighting, exhaust fan, and GFCI outlets
  • Flooring, trim, paint, and finish work
  • Accessibility upgrades and grab bar blocking

Project Gallery

Recent Work Around Rochester

More photos and reels added after every job. Follow along on Facebook and Instagram.

Ready to Redo Your Bathroom?

Free in-home estimate. Sam will walk the space with you and give you a straight number.